CamBam
News:
 
*
Welcome, Guest. Please login or register. September 09, 2010, 10:37:13 am


Login with username, password and session length


Pages: [1]
  Print  
Author Topic: cut priority  (Read 1098 times)
MikeUSNRet
CNC Ewok
*
Offline Offline

Posts: 3


View Profile
« on: February 04, 2010, 19:06:04 pm »

Hi guys.

Ok, I have a table that has a cut area of 18" in Y and 37" in X

I have some cambam files that the pieces drawn are total 23" in Y and 46" in X.


layout would look like this:

   1                                   1
   1                                   1
                                                         2          2
                                                                2


3       3      3       3         3




How can I select cut priority so I can cut the #3 pieces first,  put a new piece of stock in, cut #1's then #2's?


When I generate Gcode, it does  3 3 3 1 1 3 3 3 1 1 2 2 2
Logged
JonSimmons
CNC Ewok
*
Offline Offline

Posts: 34


View Profile
« Reply #1 on: February 05, 2010, 02:17:19 am »


The MOPs should be run in the order that they are listed in CamBam.  If you want operations to stop between sections so you can changes your work piece, maybe you can insert a tool change operation between, this should cause your control software to pause and ask for a new tool, then you can continue.

Jon
Logged
jefferylackey
Droid
**
Offline Offline

Posts: 50


View Profile
« Reply #2 on: April 18, 2010, 19:53:55 pm »

however they appear on the cut tree is the order in which they will cut. if you want to move one up or down just right click on it and select "move up" or "move down".. it will cut in any order you want that way.
Logged
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.11 | SMF © 2006-2009, Simple Machines LLC

Valid XHTML 1.0! Valid CSS! Dilber MC Theme by HarzeM
Page created in 0.179 seconds with 18 queries.

Copyright © 2008 HexRay Ltd. | Sitemap